The Pearce Building, Maidenhead

The Pearce Building, MaidenheadCompleted2015Budget£17mLocationsMaidenheadClientTIAA Henderson Real Estate Part of a flagship regeneration development, this 8-storey office building with 2-storey basement car park provides 50,000 ft2 of high quality lettable CAT A office space on a key arterial route, overlooking a park on one side and integrated into the townscape on the other. White Ink Architects…

Moneda House, Belfast

Moneda House, BelfastCompleted2018Budget£1.1mLocationsBelfastClientEML Lesley House LTD Moneda House is an existing 6-storey office building which has been refurbished to provide high quality office accommodation and cutting-edge retail space in Belfast City Centre. This project involved the addition of a new glazed extension on the ground floor which provides a fully modern entrance lobby with dedicated…

Premier Inns, UK

Premier Inns: UKCompleted2015Budget£3.5m – £16mLocationsHeathrow, Brentford, Woking, Aberdeen, MaidenheadClientMcAleer & Rushe D&B Contractors White Ink have completed a number of new build Premier Inn hotels in partnership with McAleer & Rushe D&B Contractors for various private developer clients. These have ranged in size from 100 bedrooms at Aberdeen airport to 400 bedrooms at Heathrow airport,…

Hampton Hotel, Bournemouth

Hampton Hotel, BournemouthCompleted2015Budget£48mLocationBournemouthClientTHAT GroupAwardsConstruction News Awards 2016: Finalist – Project of the Year £10m-£50m The 120-bed Hampton by Hilton Hotel is part of a mixed-use landmark development consisting of three building blocks which culminate in a 13-storey glazed tower facing the seafront at the most southerly part of the site. The 5-storey hotel is located…

Hilton Hotel, Bournemouth

Hilton Hotel, BournemouthCompleted2015Budget£48mLocationBournemouthClientTHAT GroupAwardsConstruction News Awards 2016: Finalist – Project of the Year £10m-£50m This 172-bed 4 star Hilton hotel, with 15 no. ‘Ted Baker styled’ luxury apartments above, is part of a mixed-use landmark development consisting of three building blocks which culminate in the 13-storey glazed tower of the Hilton hotel which faces the…

Terrace Mount, Bournemouth

Terrace Mount, BournemouthCompleted2015Budget£48mLocationBournemouthClientTHAT GroupAwardsConstruction News Awards 2016: Finalist – Project of the Year £10m-£50m A landmark residential and hotel project comprising three building blocks over a 2-storey basement car park which culminate in a 13-storey glazed tower facing the seafront at the most southerly part of the site. The development includes a 172-bed 4 star…

South Kensington Club, London

South Kensington Club, LondonCompleted2015Budget£4.5mLocationLondonClientGilbert Ash D&B Contractors White Ink Architects were appointed by Gilbert Ash to transform existing buildings (formerly owned by Ronnie Wood of The Rolling Stones) into a luxury Private Member’s Club on Harrington Road – an affluent conservation area in South Kensington. The design team had to overcome the complex services in…

Maldron Hotel (now Clayton Hotel), Cardiff

Maldron Hotel (now Clayton Hotel), CardiffCompleted2011Budget£14.6mLocationCardiffClientRush Projects This 12-storey mixed-use development comprises a 216-bed hotel with a state-of-the-art business conference centre, restaurant and bar, and a 5000ft² ground floor commercial unit on a tight, challenging triangular site – bounded by two busy arterial routes and the main Network railway line. The client, a commercial developer…

North Wharf Gardens, Paddington, London

North Wharf Gardens, Paddington, LondonCompletion due2021Budget£82mLocationLondonClientMcAleer & Rushe D&B Contractors This is a significant 642 room hotel and hybrid aparthotel development which rises to 19 floors over an existing 2-storey basement. The scheme features a 393-bed hotel for Premier Inn, 249 serviced apartments for Staycity and a sixth form college on a restricted site in…

Westminster Quarter, London

Westminster Quarter, LondonCompleted2017Budget£35mLocationLondonClientTaylor Wimpey Central London Located in central London, Westminster Quarter is the second phase of a significant apartment development built by McAleer & Rushe D&B Contractors for Taylor Wimpey Central London. Fronting onto Monck Street, Westminster Quarter consists of 102 apartments split among three blocks and arranged over a total of 8 floors…